Building the future of AI infrastructure

Next-gen data centres
powered by clean energy

High-performance compute across British Columbia, built on 100% clean hydroelectric power.

Energy100% Renewable
Locations3
Planned Power335 MW
Power SourceBC Hydro
RegionBritish Columbia
Energy100% Renewable
Locations3
Planned Power335 MW
Power SourceBC Hydro
RegionBritish Columbia

CedarCore's data centres are not just built — they're engineered for the future of AI.

Data centre footprint
335MW
Planned Capacity
3
Proposed Sites
100%
Renewable Energy
Purpose-built

Designed for AI

Traditional data centres weren't designed for today's GPU power and cooling demands. CedarCore's facilities are purpose-built for the most intensive AI workloads.

Advanced cooling for peak GPU performance
High-density power up to 50kW+ per rack
Sustainable clean energy powering every watt
Canadian data sovereignty and compliance
Modern data centre server rack
Server infrastructure
AI-Ready
Locations

Strategic sites across British Columbia

Three locations chosen for optimal power access, climate advantage, and fibre connectivity.

VancouverSeattleCalgaryTorontoSan FranciscoLos AngelesChicagoNew YorkMcLeod Lake300 MWPrince George30 MWMerritt5 MW
Prince George, British Columbia
ProposedProposed Site

Prince George

Proposed flagship site in BC's northern infrastructure corridor. Direct BC Hydro power and major fibre routes.

30MW
Planned capacity
4.6°C
Avg. temperature
Merritt, British Columbia
ProposedProposed Site

Merritt

Proposed edge site at BC's interior crossroads. Low-latency connectivity to Vancouver.

5MW
Planned capacity
Low
Latency to YVR
McLeod Lake, British Columbia
ProposedProposed Site

McLeod Lake

Proposed 300MW hyperscale AI campus on 100 acres in BC's northern interior.

300MW
Planned capacity
100ac
Site area
Aerial view of British Columbia forest
British Columbia's pristine wilderness
The CedarCore difference

Infrastructure engineered for what AI will demand next.

Clean Power
01

Clean Power

100% renewable hydroelectric energy from BC Hydro — among the lowest cost and cleanest in North America.

Climate Advantage
02

Climate Advantage

Northern BC's cool temperatures provide natural free cooling most of the year, dramatically reducing PUE.

Data Sovereignty
03

Data Sovereignty

Canadian-hosted, Canadian-operated. Full compliance with Canadian data residency requirements.

Let's build together

Whether you need compute capacity or want to invest in Canada's digital future.